In September, 2014 the company completed another RTG fleet assembly this time in Cameroon at Douala International Terminal (DIT) which is run jointly by Bolloré Africa Logistics and APM Terminals. The action included Grove GMKs assisting with RTG assembly. Gys Ehlers was the senior engineer on site.
ABOVE: Lifting the cab and spreader into place with Grove GNK mobile crane.