View Post
PASICO TEAM SUCCESSFULLY COMPLETE INSTALLATION OF KONECRANES OVERHEAD CRANE AT VOLTA RIVER AUTHORITY THERMAL PLANT IN ABOADZE, NEAR TAKORADI IN WESTERN REGION OF GHANA

PASICO TEAM SUCCESSFULLY COMPLETE INSTALLATION OF KONECRANES OVERHEAD CRANE AT VOLTA RIVER AUTHORITY THERMAL PLANT IN ABOADZE, NEAR TAKORADI IN WESTERN REGION OF GHANA

 / 
By
Alisa Evans
 / 
November 2023
Pasico Ghana, a subsidiary of Paterson Simons, in the latter part of 2023 completed an installation of a 62T/15T Konecranes Overhead Crane (OHC) at Volta River Authority (VRA) thermal plant in Aboadze, Ghana. This is the second Konecranes Overhead Crane we have installed at VRA Aboadze. The first 62T/15T Konecranes...